Can Heat-Line Heating Cable Systems Be Cut on The Job Site - Heat-Line Freeze Protection Systems

Can Heat-Line Heating Cable Systems Be Cut on The Job Site

Hello everyone and welcome to Heat-Line’s video blog.

A question that we commonly get at Heat-Line from our customers is “Can I cut your heating cable system on the job-site during installation?”

The simple answer to this question in a majority of cases is NO, but in some cases depending on the product of choice…please listen to the video below and learn directly from a Heat-Line specialist.

Related Posts
Selecting The Proper Heat-Line Product

Selecting The Proper Heat-Line Product

Hello and welcome to the July 2018 Heat-Line Vlog. Since inception in 1988 Heat-Line's product group has expanded from 1 to over 14 different solutions....

Drain-back Systems and the Importance of Freeze Protection

Drain-back Systems and the Importance of Freeze Protection

When water supply comes from a well or lake, some homeowners use a drain-back system for freeze protection. This system allows water to drain from...

Preventing Well Riser Pipes from Freezing

Preventing Well Riser Pipes from Freezing

Drilled or dug wells should be installed and designed so that the water supply pipe enters the well below the frost line. Therefore there is...